Fine-tune by dragging the headers: pull along the grid to reorder columns/rows, pull across it to offset a whole column or row (handy when arrows overlap). Individual nodes can be moved anywhere.
Add activities, then Shift+drag between them to create dependencies. The critical path is calculated automatically.
| Activity | Type | Duration | Progress | Dependencies | ES | EF | LS | LF | Slack | Planned Cost | Actual Cost | Cost Var. | Expected Inflow | Status | vs Baseline | Critical | Actions |
|---|
No saved projects found.
On the canvas: drag a node to move it, Shift+drag between nodes to create a dependency, double-click a node to edit, scroll to zoom, drag the background to pan.
Shared fields below apply to every activity added.
Sync projects to your account and share them with your team. No password — a link signs this device in.
CPM Planner is invite-only while it's being built. The administrator has been notified about — you'll receive a sign-in link by email once you're approved.
A sign-in link is on its way to . Open it on this device. It expires in 15 minutes.
Open sign-in linkThis project was saved by someone else after you last synced. Load their version, or overwrite it with yours — one of the two edits will be lost.