Plan your project
Add activities, then Shift+drag between them to create dependencies. The critical path is calculated automatically.
Click any cell to edit it in place · Enter saves & moves down · Tab moves right · Esc cancels · tick rows to bulk edit (Shift+click for a range)
0 selected
Activity
Type
Duration
Progress
Dependencies
ES
EF
LS
LF
Slack
Planned Cost
Actual Cost
Cost Var.
Expected Inflow
Status
vs Baseline
Critical
Actions
Untitled Project
On this phone
Local
Progress saves on this phone as you work.
Add Activity
×
💡Tip: on the network diagram, Shift+drag between nodes to create a dependency, and double-click any node to edit it.
Dependencies
×
Dependency Types
FS (Finish-to-Start): Successor starts after predecessor finishes
SS (Start-to-Start): Successor starts when predecessor starts
FF (Finish-to-Finish): Successor finishes when predecessor finishes
SF (Start-to-Finish): Successor finishes when predecessor starts
Gap / Overlap: use + to add waiting days between activities (curing time, approvals) and − to overlap them (fast-tracking)
no gap
New Project
×
The template fills in the customary sequence with durations, dependencies,
placeholder costs and client-payment milestones — an ordinary project you can
edit like any other.
Available capital at project start — used for cashflow tracking
Save Project
×
Saved in this browser. Use Export to back up as a file.
Sync to your account
Available on your other devices and shareable with your team.
Look-Ahead
×
→Print or save as PDF to hand out or post on site.
Baselines
×
A snapshot of today's dates, frozen. Editing the plan afterwards won't move it —
that's what keeps a slip visible.
Variance, delay badges and the Gantt's baseline bars all measure against the one
selected. The newest answers "how are we doing since we replanned?"; the contract
answers "how far are we from what we promised?"
Open Project
×
Your account
This browser only
No saved projects found.
Project Settings
×
All schedule dates and delay detection are relative to this
The cut-off the schedule is projected from — usually today, or your last site meeting.
Finished work is pinned to its actual dates, work in progress finishes from here, and
nothing unstarted is scheduled before it.
Available capital at project start — used for cashflow tracking
Unticked days are skipped when converting the schedule to calendar dates
National holidays for — festival dates depend on moon sighting and may shift by a day. Untick any that don't apply to your project/state.
Regional or project-specific days off not covered above
How the diagram reacts when a ⌘G group is folded into a card or unfolded. Auto-fit re-runs
your current Arrange (it never switches layout styles) so the space frees up automatically.
Combine two or more columns into one to make the network diagram narrower — e.g. merge "Internal Plaster" and "External Plaster" into "Plaster". Run Arrange again after saving to apply.
Add Cash Entry
×
e.g. loan disbursement, owner's capital, customer advance — or a fee, deposit, overhead
Group Activities
×
The selected activities get a named box on the diagram. Type an existing name to add them to that group.
Help ×
The basics
What is an activity?A card with a name and a duration in working days. Click any card to edit every field — costs, progress, dependencies.
Reading the numbersAbove a card: ES earliest start · duration · EF earliest finish. Below: LS latest start · float · LF latest finish. Float = days it can slip without moving handover.
Dependencies & lagShift+drag from one card onto another (press-and-hold on touch). Click an arrow to set its type (FS/SS/FF/SF) or a lag — “+2” means a 2-day gap.
The critical pathThe red chain has zero float: any slip there moves the finish date. Everything else has room.
Sub-networksSelect cards → ⌘G groups them. Click the ⌄ on the group's tag (or ⌥-click it) to fold the whole group into one summary card with rolled-up dates; click the card to unfold. Arrows re-route to the card — an ×n badge means several links share one arrow; click it to list or remove them. The toolbar button (or C) folds or unfolds every group at once. The diagram re-arranges and zooms to fit automatically (change this in Settings).
Views
NetworkThe diagram. ✨ Arrange lays it out like the building, learned from activity names (“1F Masonry”).
GanttBars on a calendar, with baseline comparison once you save one.
TableSpreadsheet twin — sort, edit in place, bulk-edit.
CashflowCosts out, client payments in, running balance — spot the month money runs short.
Critical PathThe zero-float chain as a checklist.
Tracking progress
% complete & statusUpdate from the card, the Table, or the phone Site view — the schedule re-plans from the data date.
Baselines & delaySave Baseline snapshots today’s plan; the status chips then measure delays against it instead of guessing.
Keyboard
Keyboard Shortcuts
×
Add activityN
Bulk add activitiesB
Switch views1–5
Save project⌘S
Undo⌘Z
Redo⌘⇧Z
Arrange layoutL
Fit project to screenF
Zoom in / out+−
Toggle gridG
Toggle dates on nodesD
Multi-select nodes⌘Click / ⇧Drag
Group into sub-network⌘G
Collapse / expand a group⌥Click tag · Click card
Collapse / expand all groupsC
Delete selected activity(s)⌫
Delete a dependencyClick arrow · ⌫
Close dialog / panelEsc
This help?
On the canvas: drag a node to move it, Shift+drag between nodes to create a dependency, double-click a node to edit, scroll to zoom, drag the background to pan.
Bulk Add Activities
×
Untick everything (and set floors to 0) to create one activity per work type
Tip: paste straight from Excel — extra columns are read as Duration, Planned Cost, Expected Inflow
Shared fields below apply to every activity added.
Type work names above to preview.
Sign in
×
Sync projects to your account and share them with your team.
This password-reset link is no longer
valid — they work once and expire after an hour. Request a new one.
🔒
Access requested
CPM Planner is invite-only while it's
being built. The administrator has been notified about
— you'll receive a sign-in link
by email once you're approved.
✉️
Check your email
A sign-in link is on its way to
. Open it on this device. It expires in 15 minutes.